top of page

NEWS
Single Well Control System
Single well control system, also named ESD Control Panel. It can simultaneously control subsurface safety valve (SCSSV), Christmas Tree...
Aug 27, 20241 min read
Â
Â
Â


What is a Flowhead?
The Flowhead is the first piece of equipment on a surface well testing package that handles flow at surface
Jul 3, 20242 min read
Â
Â
Â


Concrete Batching Plant for Indonesia
One Set of HZS60 Concrete Batching Plant supplied by WINNING for Indonesia client has been basically completed and be delivered to the...
Apr 8, 20241 min read
Â
Â
Â


HZS75 Concrete Batching Plant was Installed at the Client 's site Successfully
WINNING delivered one set of HZS75 Concrete Batching Plant to Indonesia, which includes JS1500 Concrete Mixer, PLD aggregate Batching...
Apr 8, 20241 min read
Â
Â
Â


HZS50 Concrete Mixing Plant was delivered to Oman
Winning finished fabrication and shipped one set of Concrete Mixing Plant with capacity 50m3/hr to Oman. If you are interested in the...
Mar 19, 20241 min read
Â
Â
Â


Dual Pot Sand Filter For Australia
The Dual Pot Sand Filter supplied by WINNING for Australia client has been basically completed. The Dual Pot Sand Filter is customized...
Mar 19, 20241 min read
Â
Â
Â


Sand Trap to Nigeria
One of our client from Nigeria ordered one set of API 6A 5000psi Sand Trap. The goods are finished fabrication and ready for shipment....
Mar 11, 20241 min read
Â
Â
Â


Choke Manifold Shipping to Egypt
One of our clients from Egypt ordered 5000psi choke manifold. WINNING properly arranged the package and delivery.
Mar 15, 20231 min read
Â
Â
Â


Wellhead Control Panel Shipping to Tunisia
One of our clients from Saudi Arabia ordered 1440psi three phase separator without valves & instruments from WINNING.
Mar 15, 20231 min read
Â
Â
Â


Shell and Tube Heat Exchanger for Tunisia
Fabrication of Two Sets of Shell and Tube Heat Exchanger for Tunisia will be finished.
Mar 14, 20231 min read
Â
Â
Â


Choke Manifold Shipping to Thailand
Thailand Client ordered Choke Manifold. After 50 days production, we finished the fabrication and inspection. The choke manifold were shippi
Mar 7, 20231 min read
Â
Â
Â
bottom of page